STAGE THREE - PAINT, MOLDING, FLOOR REPAIR and WINDOWS

The ceiling and walls have been primed and painted. The door to the living room was permanently removed. The thermostat was relocated and crown molding was installed.

The floors near the house's outer walls had to be replaced because they were uneven. There was a stone foundation under them that caused the floors to become uneven. The stones had to be removed and the subfloor replaced with new wood before the hardwood floors were installed.

The tv area.

More subfloor repair. This door leads to the basement - the future laundry area - another project.

Where the old chimney used to be.

New Andersen windows and new window trim.