STAGE SIX - SANDING, WOOD REPAIR, LATTICE WORK and PAINT

The front of the house was sanded to the bare wood. Damaged wood was repaired or replaced.

This area of the porch rail was replaced with new wood. New Andersen windows were installed.

New porch rail.

Stairs and railing were sanded.

This area under the porch is going to be replaced with lattice work to match the other areas under the porch and stairs.

New lattice work installed.

The trim was painted.

A new door to the basement was installed and the surrounding wood was replaced.

Final touches.

 

The side of the house is next.

Debris from the first floor renovations.

Front is finished (almost).