STAGE FOUR - FLOORS, BASEBOARD MOLDING, PAINT and RADIATOR

Installing Brazilian cherry floors.

Floors and baseboard molding installed.

Windows and moldings were taped and painted.

The door trim was painted.

The radiators were all refinished. I power washed, sanded and repainted them. They were VERY heavy! Bringing them up and down the stairs was probably the hardest part of the renovations.

The little wooden platforms for the radiator feet were stained to match the Brazilian cherry floors.

The pipes on the first floor are going to be connected to the radiator on the second floor. The pipes were exposed. We relocated the pipes behind the wall and ceiling during the renovation of the first floor.

The radiator was connected.