STAGE THREE - PRIMER, PAINT, WINDOWS and WINDOW TRIM

The first coat of primer was applied.

It took several coats of spackle and sanding to level the area where the chimney used to be so that it matched the original plaster ceiling.

The second coat of primer was applied.

The radiator in the hallway was removed. It's going to be refinished and used in the second floor bathroom.

The first coat of paint was applied.

The old windows are going to be replaced.

Tina is painting in the other room.

New Andersen windows and new insulation.

New window frames.

A closeup of the window and frame.

Molding was added to the window frame edges. It will match the molding used to top off the baseboard molding.