STAGE TWO - DRYWALL

The hole that was left from removing the chimney was replaced with drywall.

The sink and vanity cabinet for the second floor bathroom.

Large holes were drilled into the walls and insulation was blown in.

The wall connected to the bathroom now runs straight across. The lighter colored wood is new 2x4.

Lots of debris.

Drywall installed.

This was the hole that was left in the floor from removing the chimney.

The bathroom pipes are now covered. No more removable walls because no more leaks.

Always a mess.

The entire wall connected to the bathroom is now covered in drywall. The plaster wall that was not replaced was spackled and sanded to a smooth finish.

Almost ready for primer.