STAGE FOUR - PAINT, CEILING FAN, MOLDINGS, FLOOR and RADIATOR

The first coat of paint was applied.

A second coat of paint was appllied. Crown molding was installed.

Window frames were installed.

The closet doors and door frame molding were installed.

A ceiling fan was installed.

The bathroom door frame molding was installed.

The uneven floors were repaired.

Installing Brazilian cherry floors.

Baseboard molding installed.

The new closet.

The closet light.

The radiator.

The radaiators before and after they were powerwashed, sanded and spray painted.

The little wooden platforms for the radiator feet were stained to match the Brazilian cherry floors.

The pipes leading to the second floor radiator were painted to match the radiator.