FIRST FLOOR BATHROOM

The bathtub was installed.

An electical outlet was installed for the jacuzzi.

The bathtub drain pipe was installed.

The toilet drain pipe was installed.

The pipes for the bath faucet and shower were installed.

Tile backerboard was installed.

The exhaust pipe for the bathtub was installed.

The support for the sink was installed.

The sink drain and exhaust pipes were installed.

A view of the sink drain and exhaust pipes from the bedroom.

This exhaust pipe leads to the attic.

The bathtub exhaust pipe and the sink exhaust pipe were connected.

They are connected to an exhaust pipe that will go through the attic and out of the roof.

The wall had to be opened in the second floor bedroom to install the exhaust pipe.

Drywall and spackle.

Looks like it was never opened.

A hole for the second exhaust pipe. The first exhaust pipe is for the second floor bathroom.

Both pipes are going to exit the roof.

Drywall is installed on the ceiling and cement board is installed in the bath area.

Electrical is installed.

Boxes for the bathroom outlet and exhaust/light switches.

The housing unit for the ceiling exhaust/light.

Another outlet was installed for the jacuzzi water heater.

A new outlet is installed in the bedroom.

Another outlet is installed in the bedroom.

Boxes for the closet and bathroom light switches.

Inspection for electrical and plumbing.

Drywall is installed on the walls.

The shower area.

Housing unit for the ceiling exhaust/light.

The toilet area.

The sink area.

Where the mirror, light switches and electrical outlets will be installed.

For the light above the sink.

First coat of primer is applied.

Crown molding is installed.

The first coat of paint is applied.

The ceiling exhaust/light was installed.

Marble tile was installed with marble moldings. Soap dishes were installed.

Grout was applied.

Wainscoting was installed.

It was custom cut to fit the sink and cabinet.

Boxes for the outlet and fan/light switches.

The bathroom sink.

The sink base.

The sink, base, faucet and center mirror were installed.

The toilet was installed.

The shower doors were installed.

Bathtub fixtures were installed.

The jacuzzi water heater was installed.

A view of the bathroom from the bedroom.

Shutters were installed.

The wainscoting is going to be topped off with marble molding.

A towel rack was installed.

The bathtub area.

The sink area.

The left and right mirrors were installed.

The toilet.

The first set of shutters we installed (earlier pictures) did not fit perfectly so we ordered custom shutters from Home Depo Expo.

The wainscoting was topped off with marble molding.