STAGE TWO - NEW WOOD and PIPES

We installed a new subfloor and new pipes and fittings for everything.

A view from below. Extra support was added to the joists to provide a firm base for the marble floors.

New pipes for the toilet.

New pipes for the sink.

New pipes for the shower and handheld. A Grohe diverter was installed for the shower and the handheld.

New pipes for the bath faucet. Time to check for leaks.

No leaks!

The old wood and old insulation under the window are going to be replaced.

New wood and new insulation underneath.

More new wood.

The ceiling was removed.

The room across the hallway was also being renovated.