STAGE THREE - DRYWALL and BATH AREA

New drywall on the ceiling.

The existing 2x4 was used as part of the framing for the bathroom closet.

New drywall around the toilet and sink pipes.

New drywall around the medicine cabinet frame.

The framing for the medicine cabinet.

The other side of the bathroom wall.

The tile backerboard is installed and subway tile is applied to the back wall.

The rest of the subway tile is applied. Soap dishes will be installed in the 2 areas with no tile.

Before tile grout and fixtures.

After tile grout and fixtures.

Before tile grout and fixtures.

After tile grout and fixtures.

The soap dishes were installed.

The bathtub area is finished.

Drywall was installed next to the tile backerboard.

More drywall and spackle.

Starting to build the closet.

The closet's interior walls were installed.

The closet's exterior walls were installed.